Scheduling a super chain

$
0
0

Is there a way to scheduled a Superchain with 21 other chains steps built inside of that Superchain and be able to schedule that Superchain to have all chains inside, start all at the same, but run in their local time zones? Example- 5 of those jobs inside this Superchain to start at 12pm on EUR time zone and have another 8 jobs start at 12pm on NAA time zone and so on, for the different regions these jobs need to run on. Would that be possible to setup or would I have to be schedule them independently? Thanks.

Rick.