My company is having an issue with Redwood CPS. Currently running Build: M33.116.80989. Jobs that have been scheduled using Submit Frame and Time Window are skipping some of their scheduled runs. For example. Job scheduled to run every WD6 at 1:00AM EDT. So job ran normally on July 9th. But, when it rescheduled, it skipped its' August 10th run, and next scheduled for September 9th at 12:00AM EDT. Scheduling details for the September 9th run shows the following contrary times: Requested Start Time - Aug 10 1:00:00 AM Scheduled Start - September 9 12:00:00 AM Submit Frame used is called Every_1_Day Time Window used is called WD6_Adjusted_For_Holidays All preview lists of expected scheduled times for the job list the August 10th run. We have had this issue with a few other jobs, all seem to use submit frames and time windows.
↧