Hello,
We are having a problem where our Scheduled Chains, which use Submit frames. They are randomly rescheduling themselves the following hour after the correctly schedule job completes. Another odd thing is it is always rescheduled on the 11th minute of the following hour. This does not happen to only one job or a selection of them, it is very random and not every day. Thankfully, most of the chains have a wait event, so they do not complete, but we do have a few chains with a Time dependency only, which are resubmitting. We have been working with our basis team, and have recycled the system numerous times hoping a cache of some sort might have something to do with it.
All of our jobs are scheduled Once a day using the SubmitFrame/TimeWindows, respectively.
We promote from test environment into our production environment, with no changes being completed in production.
Has anyone had a similar problem or know of a resolution?
See attachment as an example.
Thanks
Brandi