Hello,
To manage easier some down-time planned for maintenance, I'm testing the creation of a “time window" with a closed period and assignation to a queue
Previously I have yet created similar time window and assign it to jobs, and all work properly.
But assigning this type of Time Window (with ‘closed” period) to a queue does not work.
->> when the close period starts the planned jobs (with status scheduled ) get the status
"queued"
->> but when the close period ends the jobs keep the status 'queued' and never start.
In same time, the jobs scheduled after the “closed” periode run normally
As soon as I remove the time windows from the queues, the jobs with status "queued" start immediately
Have you yet detected this phenomena? Where I was wrong ?
Thanks,
Delphine